- مجله: Advance Researches in Civil Engineering
- نوع مقاله: Journal Article
- کلمات کلیدی: Risk Management,Safety Risk,Construction management,construction project
- چکیده:
- چکیده انگلیسی: In the world, accidents that occur in construction projects are ta fairly high part. Several factors cause this accident. One of those is a lack of information about occupational health and safety risk. In the construction project, it is necessary to know about safety risks to minimize the number of accidents, besides that, it is necessary to know the parties responsible for safety risk if there’s an accident in the working area. The paper of this literature review is to present risks that cause a safety risk for the past ten years. The result of this paper is safety risk factors as seen from risk responsibility; Client’s responsibility, Contractor’s responsibility, Shared responsibility, and Undecided Responsibility. This research used a systematic literature review. Based on 26 journals review about safety risk, the most responsibility in construction projects about those risks is the Contractor’s Responsibility (57%).
- انتشار مقاله: 22-04-1399
- نویسندگان: Marsha Enrica,Humoras Purba,Aleksander Purba
- مشاهده
- جایگاه : پژوهشی
- مجله: Advance Researches in Civil Engineering
- نوع مقاله: Journal Article
- کلمات کلیدی: Risk Identification,Fidic contract
- چکیده:
- چکیده انگلیسی: Most major construction projects in the world are based on standard contract conditions for international projects issued by the Fédération Internationale des Ingénieurs-Conseils (FIDIC, or International Federation of Consulting Engineers), which are based on concept law rooted in the common law system. Thus, the stakeholders involved in construction projects in the World need to understand the interpretation of FIDIC provisions against a background of civil law. This literature study will explore the identification of risks that occur in international projects using FIDIC contracts. A systematic review and detailed content analysis of 30 articles selected from respected academics and relevant journals published over the past three decades was carried out. The findings of risk identification are divided into 5 namely (1) Planning and Design, (2) Construction, (3) Operations & Maintenance, (4) Political Environment and (5) Social Economic. This study trying to identify, investigate, and classify the strongest factors that are considered to influence delays in construction projects. From the results of grouping identification, it is found that the greatest risk in FIDIC construction contracts is when the construction work is caused due to the complexity of the problems at the time of the construction, whether the dispute, payment or claims of work results. Recommendations from the authors would be good for the relevant stakeholders the project uses the FIDIC contract to further study the contents of the contract to help reduce or at least minimize the risk of project delays, especially during construction.
- انتشار مقاله: 12-07-1398
- نویسندگان: Humoras Purba,Toni Yuri Prastowo
- مشاهده
- جایگاه : پژوهشی
- مجله: Advance Researches in Civil Engineering
- نوع مقاله: Journal Article
- کلمات کلیدی: Railway project,Tunnel construction,Railway risk factor,Risk Management
- چکیده:
- چکیده انگلیسی: Population growth makes public transportation needs increase, one of the needs for the availability of population growth is the need for availability of railway. However, the available land for railway construction is very limited, therefore experts design the railway using a tunnel. Risk analysis in Railway projects with tunnel design is carried out to determine the most important type of risks. The results of this research show that the railway project with tunnel design has the same risks as railway projects with other designs, there are site risk and environmental risk. After finding the most important risk, use the Multiphase risk management method to manage this risk.
- انتشار مقاله: 09-05-1398
- نویسندگان: Kevin Arga,Humoras Purba